Electrical installation
Electrical installation in a new build: what to prepare before work starts?
The electrician arrives before the plastering. What to prepare so the wiring does not have to be redone: plan, appliances, board, lighting and reserves.
Published by: Andrii MatovkaPublished 6 min read

In this article
In a new build the electrical installation is usually done in two steps, and the first takes place before the walls are plastered and the rooms painted. Whatever is not done in the walls in time is harder to sort out later. It pays to have the groundwork ready before the electrician arrives.
This article is about planning and preparation. What the price is made of and how to read a quote is explained in How much does electrical installation cost in a Prague apartment?, and how the electrical installation work is divided is on the service page.
The two stages and when each happens
| Stage | What usually happens | What to have ready |
|---|---|---|
| First fix (before plastering) | Chasing, laying cables, installation boxes, conduits, fitting the board enclosure. | Marked positions of sockets, switches and lights, cable routes, position of the board, spare conduits. |
| Second fix (after plastering and painting) | Fitting sockets, switches and light fittings, connecting the board, testing. | The chosen accessories and light fittings (type, colour) and access to the finished rooms. |
| Tests and initial inspection | Testing the installation once fitting is finished; the initial inspection before it is put into operation is carried out by an inspection technician. | Documentation and access for the inspection technician; the inspection is ordered separately. |
The exact division differs from one building to another. Agree in advance what is done when and who is responsible for what.
What to prepare before work starts
A plan with the furniture and the kitchen
Sockets, switches and lights are planned around the furniture. If you do not yet have the final kitchen, get the drawing from the kitchen studio as early as possible: it shows the position of the units, appliances and any island that the cables must reach. How many sockets and where is covered in How many sockets do you need in a flat and where should they go?.
A list of appliances, including future ones
Oven, induction hob, dishwasher, washing machine, tumble dryer, air conditioning; in a family house possibly a heat pump or an electric-car charger. Large appliances usually need a circuit of their own, which affects the size of the board. Among my services is preparing the wiring for a kitchen, air conditioning and charging stations.
The position of the board, meter and cabling
The board should be easy to reach and have room for extension. Find out where the supply and the meter are (in a flat in a developer's project the project usually sets it) and where the main cable will run. The application for connection to the distribution network is usually handled by the owner with the electricity distributor; agree in advance who does what.
Lighting
Decide what fittings you want: ceiling points, recessed spotlights, LED strips, wall lights. Each type needs its own feeds, and recessed lights and LED strips also need room for their power supplies; mark them before the ceilings are closed. The Lighting service belongs here.
Low-voltage cabling and reserves
Internet, aerial, doorbell, cameras or a smart home: cables and empty conduits are much easier to lay now than afterwards. An empty conduit makes it easier to pull a cable later without opening the walls.
Coordination with the other trades
The electrician comes after the bricklaying and before the plastering, and often overlaps with the plumber, ventilation or plasterboard fitter. Agree the order, the dates and who has access when, so the work does not collide and nothing has to be broken open twice.
Access and site conditions
Clarify when the site will be accessible, where the power for tools will come from and where materials will be stored. For a flat in a new build, find out from the developer what the standard includes (wiring, board, number of sockets) and what you provide yourself.
The board, circuits and a reserve for the future
The distribution board is the centre of the installation. The number and division of circuits follow from the appliances and the layout of the rooms. Lighting and sockets are usually on separate circuits and large appliances have circuits of their own, so one failure does not darken the whole flat. When designing, it pays to leave room in the board for further circuits, say for a car charger or air conditioning that will be added later. What to do when a circuit starts tripping is explained in Why does the circuit breaker keep tripping?.
Examples of my work: Distribution board installation and Switchboard installation process.
Mark, photograph, document
Before the plaster covers them, photograph the cable and box routes; it will help you one day when drilling or making changes. Agree in advance what documentation of the finished work you will receive. What marking socket positions and cable routes on bare masonry looks like is shown by the project Electrical installation in Germany, and how cables are laid by Cable laying.
What to ask the electrician before work starts
- What does the quote include: first fix, second fix, the board, testing?
- Who supplies the sockets, switches and light fittings and by when must I choose them?
- How and until when can I change the layout before the walls are closed?
- What access and power do you need for the work?
- Who orders the initial inspection and when will it be done?
Frequently asked questions
When should the electrician start in a new build?
First-fix work is done before plastering. It is wise to consult even earlier, before the layout and the kitchen are final, because the routes are marked from them. The exact date follows from the building schedule.
Do I need an electrical design?
For a family house the electrical installation is usually part of the design documentation. For a flat in a new build, find out from the developer what the standard includes and what you provide yourself. The electrician can advise on what needs adding.
What if I rearrange the furniture later?
After plastering a change means opening the walls, so the layout is worth thinking through before the first fix. Adding a socket to a finished wall is still ordinary work.
Who carries out the initial inspection?
An inspection technician with a certificate; it is ordered separately from the installation work. I do not perform electrical inspections (revize). More on inspections in When does electrical wiring need replacing?
Should I prepare reserves for electric-car charging?
If you are considering charging, say so before work starts. Preparing the wiring for charging stations is among my services; the specific solution depends on the board and the layout.