- Why there is no single price per apartment
- What the price of electrical installation is made of
- What raises the price and what lowers it
- Replacing old wiring in a flat: what affects the price
- Fixed price, budget or actual cost?
- What a quote should contain
- How to save without taking risks
- Inspection and safety
- How long it takes
The question I hear most before an apartment renovation is: how much will it cost? The honest answer is that there is no single number. The wiring of a panel-block 2+kk flat differs from that of a renovated brick 3+1 in scope, materials and difficulty. It can therefore only be determined reliably from the scope of the work: after a visit, or from a detailed description and photos.
I deliberately do not list amounts: prices move with materials and scope, and misleading figures would do more harm than good when you plan your budget. What the work involves is described on the service page for electrical installation in flats and houses; a finished example is the project Electrical installation in an apartment.
Why there is no single price per apartment
Two apartments of the same size can come out very differently. The main factors are:
- Scope of work: brand-new wiring from the board to the last socket, or just replacing some circuits or adding sockets.
- Type and condition of the walls: cables run differently in a panel block than in a brick flat or behind plasterboard, and every surface makes different demands on chasing.
- Number and kind of end points: sockets, switches, lighting points and separate circuits for appliances such as the oven, induction hob, washing machine, dishwasher or air conditioning.
- Distribution board and protection: whether the existing board is simply extended or replaced entirely, and which breakers and RCDs are used.
- Conditions on site: whether the work is done in an empty flat before the renovation or while people live there and the work has to be split into stages.
- Materials: a standard range of sockets and switches costs differently from a designer or smart one, even within the same job.
What the price of electrical installation is made of
An honest quote splits the price into clear parts. That way you know what you are paying for and can compare several quotes:
- Labour: installing and connecting cables, boxes, sockets, switches and light fittings, fitting the board and testing.
- Materials: cables, installation boxes, breakers, RCDs, the board, sockets and switches including frames.
- Travel and call-out: ask whether travel is included in the price or charged separately, and how.
- Related work: chasing and making good the walls, if they are part of the quote. A bricklayer or painter often handles them and they are usually not in the electrician's quote, so check in advance.
- Inspection (revize): ordered separately from an inspection technician, see below.
- VAT status (DPH): when comparing quotes it helps to know whether the contractor is a VAT payer. I am not a VAT payer.
What raises the price and what lowers it
| Situation | Effect on price | Why |
|---|---|---|
| Working in an empty flat before the renovation | Usually lower | The electrician has free access and nothing to protect or move. |
| Living in the flat during the work | Usually higher | The work is split into stages and power has to be kept on throughout the flat. |
| Old wiring that first has to be assessed | Harder to estimate | The real condition sometimes shows only after the walls or the board are opened. |
| More separate circuits for appliances | Higher | Every circuit means its own conductor, breaker and working time. |
| Partial replacement or adding sockets | Lower than a full replacement | Suitable if the rest of the installation is in good condition and has enough capacity. |
Replacing old wiring in a flat: what affects the price
Replacement differs from new wiring in an empty flat because what is already in the walls has to be assessed too. The price of a replacement is influenced mainly by:
- Condition and type of the existing wiring: the real condition sometimes shows only after the walls or the board are opened; in older flats you may find, for example, aluminium wiring or wiring without a protective conductor.
- Extent of the replacement: all the wiring or only part of it, for example the board or one room.
- What happens to the old wiring: ask whether the quote includes disconnecting and removing the old lines or whether they stay in the wall.
- Circuits for today's appliances: an older installation did not plan for them, so separate circuits are often added during a replacement (oven, induction hob, dishwasher, air conditioning).
- Related work: chasing, making good the walls and painting are usually done by other trades; check what the quote includes.
How to tell that replacement is already due is covered in When does electrical wiring need replacing?. I assess the condition of the wiring and faults as part of the Repairs and Faults service; a visit and photos of the board give a more precise idea of the scope.
Fixed price, budget or actual cost?
The price of work can be agreed in three ways, and each gives a different degree of certainty:
- Fixed price: the amount does not change even if the work turned out to need more effort than expected. It suits a clearly defined scope.
- Budget: the price follows from individual line items. What matters is whether the budget is binding and under what conditions it may be increased.
- Actual cost: you pay for the hours worked and the materials used, usually with an estimate of the total.
Always ask how the price is determined and when it can change. A reasonable quote states that extra work is carried out only after your approval and with a stated price.
What a quote should contain
A good quote is specific. It should include:
- the subject and scope of the work, meaning what is done and what is not,
- a list of materials and who supplies them,
- the price, how it is determined and whether the contractor is a VAT payer,
- travel and any further charges,
- indicative start and completion dates,
- payment terms and any deposit,
- what happens when extra work is needed,
- whether making good the walls is included.
Good preparation helps avoid later changes. What to have ready before work starts is covered in Electrical installation in a new build: what to prepare before work starts?, and how to plan sockets room by room in How many sockets do you need in a flat and where should they go?.
How to save without taking risks
- Decide in advance where the sockets go. Adding them after the chases are opened is usually dearer than planning ahead.
- Combine the electrical work with the renovation. The electrics are planned before the bricklaying and painting. The right order saves time and money.
- Do not skimp on the board and protection. Good protection and RCDs serve your safety, and saving on them does not pay off.
- Compare quotes by content, not only by price. A lower price often means materials, travel or making good the walls are missing.
- Bundle several jobs into one order. Fewer call-outs usually mean lower travel costs. A typical example is replacing a socket: several small things get done in one visit.
Inspection and safety
New wiring should finish with tests and an initial inspection. The inspection report shows that the installation was checked and measured. It is also useful when selling or letting the flat or when dealing with an insurer. I do not perform electrical inspections (revize); they are carried out by an inspection technician with a certificate and ordered separately from the installation work. When it is worth checking the existing wiring too is covered in When does electrical wiring need replacing?
How long it takes
The duration depends on the scope of the work and the condition of the flat. I will confirm an estimate of the duration and the exact date after the visit and after we agree the scope.